Gimli Water Treatment Plant
Performing as the General Contractor, we supplied and installed a sludge dewatering centrifuge and conveyor within the existing Gimli Wastewater Treatment Plant.
Wescan completed the Mechanical Installation for the Five storey Level 2 and 3 virology labs additions including the supply and installation of sophisticated HVAC systems, specialized sanitary systems, clinical autoclaves, and specialty fume hoods.
Design, Bid, Build
Smith Carter
Larry Wiens
Rob Beaulieu
Shawn Henry
Bird Construction
Performing as the General Contractor, we supplied and installed a sludge dewatering centrifuge and conveyor within the existing Gimli Wastewater Treatment Plant.
Wescan installed electrical power, backup power, communication services and PLC controls for the facility.
1049 Logan Avenue, Winnipeg, R3E 1P6 Canada
Copyright © 2023 Wescan Construction Services. All Rights Reserved.