Headingley Water Treatment Plant
Wescan installed electrical power, backup power, communication services and PLC controls for the facility.
The Headingley Water Treatment Plant is the second largest water treatment facility in Manitoba, servicing Headingley Correctional Centre, R.M. of Headingley, and Centreport Development. Headingley Water Treatment Plant is a potable water facility; Water is drawn from the river to settling ponds then to the Treatment Plant. The treatment process includes enhanced coagulation, ultra filtration, reverse osmosis filtration, calcite contactors for finished water hardness, and chlorine disinfection.
Wescan installed electrical power, backup power, communication services, and PLC controls for the facility.
Bid Spec
Stantec Consulting
Mike Wiebe
Jon Duncan
Bird Construction
Wescan installed electrical power, backup power, communication services and PLC controls for the facility.
Performing as the General Contractor, we supplied and installed a sludge dewatering centrifuge and conveyor within the existing Gimli Wastewater Treatment Plant.
Wescan provided our electrical installation services for the construction of a new 68,000 ft2 Data Centre to replace the aging downtown facility. This Centre houses all of the data for Great West Life across Canada which required high level security and confidentiality.