Manitoba Hydro Downtown Office
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
The Journey to Churchill project is one of the largest Polar Bear Research Centres and Exhibits in the World. Wescan provided Mechanical Services for the state-of-the-art facility that houses polar bears, seals, muskox, arctic foxes, snowy owls, and caribou.
The saltwater filtration system consisted of using: sand filters, degas towers, ozone generators, ozone speece cones, protein fractionators, and a backwash recovery system. The backwash recovery system was installed to minimize the consumption of salt within the exhibits.
Water Systems
Additional Systems
Project Highlights
Design-Bid-Build
Scott Stronciski
Shawn Henry
SMS Engineering Ltd.
Stuart Olson
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
Scope of work included installation of the lighting system, energy efficient sport lighting system, building control systems, communication systems, energy efficient distribution system, state of the art entertainment system (including jumbo-tron), and life safety systems.
Wescan performed components of the demolishing of a 25,000 sq ft. facility while simultaneously maintaining functional hospital systems that included: Fire Protection, Ventilation, Medical Gas, Sanitary Sewer, Storm, Hot Water Heating, Chilled Water, Low Pressure Steam, Medium Pressure Steam and High Pressure Steam.
1049 Logan Avenue, Winnipeg, R3E 1P6 Canada
Copyright © 2023 Wescan Construction Services. All Rights Reserved.