Manitoba Hydro Downtown Office
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
The Canadian Museum for Human Rights (CMHR) is a state-of-the-art national museum, the first outside of Ottawa. It is targeting LEED Silver certification.
CMHR is a 260,000 square foot building comprised of 12 levels of unique design-housing galleries, an impressive array of digital exhibits, 2nd floor office spaces, an LED lit alabaster stairwell, and the illuminated Tower of Hope.
Wescan completed the electrical installation for the new base building in addition to the tenant and exhibit fit-ups.
Bid Spec
Halcrow Yolles
Terry Dawson
Marc St. Goddard
Max Wehrle
PCL Constructors Canada
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
Scope of work included installation of the lighting system, energy efficient sport lighting system, building control systems, communication systems, energy efficient distribution system, state of the art entertainment system (including jumbo-tron), and life safety systems.
Wescan performed components of the demolishing of a 25,000 sq ft. facility while simultaneously maintaining functional hospital systems that included: Fire Protection, Ventilation, Medical Gas, Sanitary Sewer, Storm, Hot Water Heating, Chilled Water, Low Pressure Steam, Medium Pressure Steam and High Pressure Steam.
1049 Logan Avenue, Winnipeg, R3E 1P6 Canada
Copyright © 2023 Wescan Construction Services. All Rights Reserved.