University College of the North
Wescan was selected by PCL, Smith Carter Architects (SCA), UCN and MIT on this design assist project to construct both the mechanical and electrical for this new university in Thompson Manitoba.
The Canadian National Railway Training Centre is the starting point for all newly hired operations personnel working in Canada.
The 100,000 sq. ft. facility has the ability to train various levels of employees from locomotive engineers and conductors to track supervisors and signal maintenance crews. The facility is complete with hands on life size learning tools such as engines, rails, switching stations and simulators. It also includes an outdoor training area.
Wescan completed installation for the facility including classrooms, shops, office areas, large scale training areas and simulator rooms.
Bid Spec
Genvar
Arshia Ahmed
Kevin Leung
Robert Turkula
Akman Construction
Victor Neudrof
Wescan was selected by PCL, Smith Carter Architects (SCA), UCN and MIT on this design assist project to construct both the mechanical and electrical for this new university in Thompson Manitoba.
The Journey to Churchill project is one of the largest Polar Bear Research Centre and Exhibits in the World. Wescan provided Mechanical services for the state of the art facility that houses polar bears, seals, muskox, arctic foxes, snowy owls and caribou.
Outlet Collection Winnipeg is a fully enclosed shopping center development with a total retail floor area of 570,000 square feet. It was a very challenging project with over 1000 changes issued due to constant tenant and leasing changes during construction.
1049 Logan Avenue, Winnipeg, R3E 1P6 Canada
Copyright © 2023 Wescan Construction Services. All Rights Reserved.