Manitoba Personal Care Home Visitation Pods

Electrical design build services for the construction and field installation of 105 shipping containers, 8’ wide by 40’ long, converted into visitation pods for personal care homes across the province of Manitoba during the Covid-19 pandemic.

The unique challenge of this project was the extremely aggressive schedule. During fabrication, 4 pods per day were completed and shipped to 88 separate locations across Manitoba. Varied custom power requirements were needed to ‘link’ the corridors with electrical, lighting and HVAC to connect the visitation pods to the PCH.

SCOPE OF WORK
  • Lighting
  • Smoke alarm
  • HVAC power distribution
  • Electric heating
  • Convenience power
  • Controls wiring

download line card

Project Details

Owner: Shared Health Manitoba
Type of Service: Structural Steel
Sector: Healthcare
Completed: 2021
Value: $4,964,000
Delivery Method

Design Build

Engineer

Apollo Engineering

Superintendent

Scott Vernon

Project Manager

James Marsh

Contractor

Graham Construction