Manitoba Hydro Downtown Office
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
The Misericordia Health Centre Redevelopment – Phase project consisted of demolishing and building a new Health Care Centre. Wescan provided a new mechanical system that was designed and installed to efficiently utilize a glycol heat reclaim system to capture loss from exhaust fans and air conditioning condensing units.
Wescan performed components of the demolishing of a 25,000 sq ft. facility while simultaneously maintaining functional hospital systems that included: Fire Protection, Ventilation, Medical Gas, Sanitary Sewer, Storm, Hot Water Heating, Chilled Water, Low Pressure Steam, Medium Pressure Steam and High Pressure Steam.
Upon demolition completion, Wescan completed building the new 75,000 sq ft Health Centre. Construction of the new facility consisted of tying in to the existing three-sided mechanical systems and renovation of the existing 80 year old, 20,000 sq ft facility.
Bid Spec
SMS Engineering
Shawn Henry
Niels Kaczorowski
Bird Construction
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
Scope of work included installation of the lighting system, energy efficient sport lighting system, building control systems, communication systems, energy efficient distribution system, state of the art entertainment system (including jumbo-tron), and life safety systems.
Wescan performed components of the demolishing of a 25,000 sq ft. facility while simultaneously maintaining functional hospital systems that included: Fire Protection, Ventilation, Medical Gas, Sanitary Sewer, Storm, Hot Water Heating, Chilled Water, Low Pressure Steam, Medium Pressure Steam and High Pressure Steam.
1049 Logan Avenue, Winnipeg, R3E 1P6 Canada
Copyright © 2023 Wescan Construction Services. All Rights Reserved.