Manitoba Hydro Downtown Office
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
This project consisted of a new 440,000 square foot sporting facility with the capability of seating 15,015 people. The challenge was to build a functional, modern building and to do so within a limited budget.
This involved a design assist approach, with a guaranteed maximum price in mind, with all the parties involved. The end result is a facility that is known for its excellent sound and has made Winnipeg a more prominent location for concerts. As of 2008, the new MTS Centre was listed as the 19th busiest arena in the world, (something that all Winnipeggers can be proud of).
Installation of the lighting system, energy efficient sport lighting system, building control systems, communication systems, energy efficient distribution system, state-of-the-art entertainment system (including jumbo-tron), and life safety systems.
Design Assist
MCW – AGE
Max Wehrle
Vic Reid
PCL Constructors Canada
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
Scope of work included installation of the lighting system, energy efficient sport lighting system, building control systems, communication systems, energy efficient distribution system, state of the art entertainment system (including jumbo-tron), and life safety systems.
Wescan performed components of the demolishing of a 25,000 sq ft. facility while simultaneously maintaining functional hospital systems that included: Fire Protection, Ventilation, Medical Gas, Sanitary Sewer, Storm, Hot Water Heating, Chilled Water, Low Pressure Steam, Medium Pressure Steam and High Pressure Steam.
1049 Logan Avenue, Winnipeg, R3E 1P6 Canada
Copyright © 2023 Wescan Construction Services. All Rights Reserved.