NML Federal Virology Lab

Wescan completed the Mechanical Installation for the Five storey Level 2 and 3 virology labs additions including the supply and installation of sophisticated HVAC systems, specialized sanitary systems, clinical autoclaves, and specialty fume hoods.

SCOPE OF WORK
  • High Pressure Steam system for Bio Hazard Rotoclave.
  • Medium Pressure Steam system for Autoclave.
  • Low Pressure Steam for Building Heating using a steam to glycol heat exchanger.
  • Low Pressure Steam for Building Humidification.
  • 1 AHU for Level 3 heating and air distribution.
  • 1 AHU for Level 2 heating and Air Distribution.
  • Both AHU’s used heat reclaim coils off building exhaust.
  • Bio Hazardous sanitary drainage.

download line card

Project Details

Owner: Public Health Agency of Canada
Type of Service: Mechanical
Sector: Institutional
Completed: May 2012
Value: $3,500,000
Delivery Method

Design, Bid, Build

Engineer

Smith Carter
Larry Wiens

Superintendent

Rob Beaulieu

Project Manager

Shawn Henry

Contractor

Bird Construction

Project Gallery

Explore

Other Historical Projects

NML Federal Virology Lab

Wescan completed the Mechanical Installation for the Five storey Level 2 and 3 virology labs additions including the supply and installation of sophisticated HVAC systems, specialized sanitary systems, clinical autoclaves, and specialty fume hoods.

View Project »

South End Waste Water Pollution Plant Upgrade

Winnipeg South End Water Pollution Control Center (SEWPCC) involves expanding and upgrading the facility to meet the operating and effluent limits outlined in Environment Act License 2716RR dated April 18, 2012, as well as accommodating year 2031 forecasted influent flows and loads.

View Project »

Roquette Pea Plant Portage La Prairie

Built as the world’s largest Pea Protein Plant located in Portage La Prairie, to provide Canada’s organic pulse growers with access to a new domestic market and aims to better meet the growing demand for pea protein around the world.

View Project »