Gimli Water Treatment Plant
Performing as the General Contractor, we supplied and installed a sludge dewatering centrifuge and conveyor within the existing Gimli Wastewater Treatment Plant.
For the Red River College Innovation Center project, Wescan BIM modeled to 95%, which enabled us to pre-fabricate 87% of the electrical installation. This included support system, conduit packages, wall assemblies, lighting fixtures, panels, and transformers.
Incorporating many changes and new buildings into the job as the build went on was a joint collaboration between the owner, engineer, general contractor, and Wescan’s project team to provide “innovations” as the project progressed. Our relationship with, and commitment to all levels of the design and construction process received Wescan high praise and recommendation from the client, engineer, and architect.
Performing as the General Contractor, we supplied and installed a sludge dewatering centrifuge and conveyor within the existing Gimli Wastewater Treatment Plant.
Wescan installed electrical power, backup power, communication services and PLC controls for the facility.