Transit Garage Expansion & Renovation

The Transit Garage Expansion and Renovation Project (approximately $50M total in construction value) was a Design Build / Design Assist challenge for Wescan.

The project included a 70,000 square foot addition, a complete campus distribution electrical upgrade with 100% generator back up, and 18 new bus bays added onto the existing facility; These included in-ground bus hoists, process fluid distribution systems, 8 pre-manufactured prep/paint booths, a new weld shop, foreman offices, and fluid room.

The renovation portion included new accounting offices, boardrooms, classrooms, and vault within the existing facility. This project benefited from our Wescan Planning & Detailing team, incorporating full BIM 3D technology for clash detection, construction coordination, and pre-fabrication to provide a precise and efficient solution.

SCOPE OF WORK

Mechanical:

  • HVAC Systems and Controls
  • Plumbing Systems
  • Process Fluid and Distribution Systems including high pressure lubricants, process water, air, and hose reels
  • Breathable and Compressed Air Systems
  • Pressure Washing and Central Vacuum Equipment
  • New Equipment Supply and Install
  • Commissioning and LEED Certification

Electrical:

  • 25kV Switchgear Supply and Install
  • 25kV Underground Distribution Loop, 4 mini sub transformers, 4 gensets for 100% facility backup power
  • Replacement and Upgrade of existing distributions, feeders, and sub panels during coordinated shutdowns to maintain facility operations.
  • Fire Alarm and Life Safety Systems

Finishing Systems:

  • Four NFPA33 compliant steel downdraft bus paint prep booths
  • Four NFPA33 compliant steel downdraft spray application bus paint booths with bake function
  • Four cross-draft bus refurbishment bays with floor to ceiling modular section welding curtains
  • Paint Mix Room

download line card

Project Details

Owner: City Of Winnipeg
Type of Service: Mechanical, Electrical & Finishing Systems
Sector: Commercial
Completed: July 2019
Value: $18,300,000
Delivery Method

Design Assist (M&E) Design Build (Finishing)

Project Manager

James Marsh (M&E)
Murray Modjeski (Finishing Systems)

Superintendent

Ben Poole (Mechanical)
Scott Vernon (Electrical)
Bill Maruca (Finishing)

Architect & Engineer

AECOM

Contractor

PCL Constructors Canada

Project Gallery

Explore

Other Iconic Projects

MTS Centre – Sports and Entertainment Arena

MTS Centre – Sports and Entertainment Arena

Scope of work included installation of the lighting system, energy efficient sport lighting system, building control systems, communication systems, energy efficient distribution system, state of the art entertainment system (including jumbo-tron), and life safety systems.

View Project »
Misericordia Health Centre

Misericordia Health Centre Redevelopment

Wescan performed components of the demolishing of a 25,000 sq ft. facility while simultaneously maintaining functional hospital systems that included: Fire Protection, Ventilation, Medical Gas, Sanitary Sewer, Storm, Hot Water Heating, Chilled Water, Low Pressure Steam, Medium Pressure Steam and High Pressure Steam.