Manitoba Hydro Downtown Office
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
Canada Life TP-06 project was done as a design assist collaboration between NTAG, Bockstael, SMS, Nortec and Wescan to decommission an existing steam power plant and upgrade to a new natural gas hot water power plant, along with a replacement and centralization of the Chiller Plant at Canada Life campus on 60/80/100 Osborne. Steam to Hot Water Heating switch over was phased to accommodate the ongoing renovations on campus. Project was completed with on time fabrication delivery, to allow for no storage or C-Can’s on site as the project was completed while the building was occupied.
Design Assist
Scott Stronciski
Darcy Stadnichuk
SMS Engineering
Bockstael Construction
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
Scope of work included installation of the lighting system, energy efficient sport lighting system, building control systems, communication systems, energy efficient distribution system, state of the art entertainment system (including jumbo-tron), and life safety systems.
Wescan performed components of the demolishing of a 25,000 sq ft. facility while simultaneously maintaining functional hospital systems that included: Fire Protection, Ventilation, Medical Gas, Sanitary Sewer, Storm, Hot Water Heating, Chilled Water, Low Pressure Steam, Medium Pressure Steam and High Pressure Steam.