Gimli Water Treatment Plant

Performing as the General Contractor, we supplied and installed a sludge dewatering centrifuge and conveyor within the existing Gimli Wastewater Treatment Plant.

SCOPE OF WORK
  • Concrete Base Supports and Masonry Wall Modification to support both the centrifuge and conveyor
  • Process piping, which included sludge, flushing water, and air piping
  • Electrical, which included new distribution and panels for centrifuge, conveyor, and polymer pump skid
  • Instrumentation
  • PLC Controls, which included integration into existing BMS system and updating existing centrifuge to work in a lead/lag operation
  • Polymer Testing
  • Refurbishment of existing centrifuge, which included gear replacement and control software update
  • New Effluent Sampling System

download line card

Project Details

Owner: RM of Gimli
Type of Service: Mechanical & Electrical
Sector: Industrial
Completed: 2018
Value: $1,059,000
Delivery Method

Bid Spec

Engineer

Birchtree Consulting Ltd.

Superintendent

Sheridan Wiebe

Project Manager

Scott Stronciski

Contractor

Ellis Don

Project Gallery

Explore

Other Historical Projects

South End Waste Water Pollution Plant Upgrade

Winnipeg South End Water Pollution Control Center (SEWPCC) involves expanding and upgrading the facility to meet the operating and effluent limits outlined in Environment Act License 2716RR dated April 18, 2012, as well as accommodating year 2031 forecasted influent flows and loads.

View Project »

NML Federal Virology Lab

Wescan completed the Mechanical Installation for the Five storey Level 2 and 3 virology labs additions including the supply and installation of sophisticated HVAC systems, specialized sanitary systems, clinical autoclaves, and specialty fume hoods.

View Project »