Manitoba Hydro Downtown Office
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
The Manitoba Hydro Downtown Office tower is Winnipeg’s 4th tallest structure and serves as Manitoba Hydro’s main headquarters.
The Manitoba Hydro Office Tower is one of the most energy efficient buildings of its size in North America, consuming 60% less energy than the national building code requires. All of this was accomplished with a guaranteed maximum price in mind, and Wescan was instrumental with the Design Assist concept in order to maximize cost savings in the final design. The project received LEED certification.
Electrical installations consisted of state-of-the-art lighting, building control systems, energy efficient distribution systems, and life safety systems.
Design Assist
Earth Tech
Vic Reid & Max Wehrle
Max Wehrle
PCL Constructors Canada
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
Scope of work included installation of the lighting system, energy efficient sport lighting system, building control systems, communication systems, energy efficient distribution system, state of the art entertainment system (including jumbo-tron), and life safety systems.
Wescan performed components of the demolishing of a 25,000 sq ft. facility while simultaneously maintaining functional hospital systems that included: Fire Protection, Ventilation, Medical Gas, Sanitary Sewer, Storm, Hot Water Heating, Chilled Water, Low Pressure Steam, Medium Pressure Steam and High Pressure Steam.
1049 Logan Avenue, Winnipeg, R3E 1P6 Canada
Copyright © 2023 Wescan Construction Services. All Rights Reserved.