University College of the North
Wescan was selected by PCL, Smith Carter Architects (SCA), UCN and MIT on this design assist project to construct both the mechanical and electrical for this new university in Thompson Manitoba.
The Manitoba Hydro Downtown Office tower is Winnipeg’s 4th tallest structure and serves as Manitoba Hydro’s main headquarters.
The Manitoba Hydro Office Tower is one of the most energy efficient buildings of its size in North America, consuming 60% less energy than the national building code requires. All of this was accomplished with a guaranteed maximum price in mind, and Wescan was instrumental with the Design Assist concept in order to maximize cost savings in the final design. The project received LEED certification.
Electrical installations consisted of state-of-the-art lighting, building control systems, energy efficient distribution systems, and life safety systems.
Design Assist
Earth Tech
Vic Reid & Max Wehrle
Max Wehrle
PCL Constructors Canada
Wescan was selected by PCL, Smith Carter Architects (SCA), UCN and MIT on this design assist project to construct both the mechanical and electrical for this new university in Thompson Manitoba.
The Journey to Churchill project is one of the largest Polar Bear Research Centre and Exhibits in the World. Wescan provided Mechanical services for the state of the art facility that houses polar bears, seals, muskox, arctic foxes, snowy owls and caribou.
Outlet Collection Winnipeg is a fully enclosed shopping center development with a total retail floor area of 570,000 square feet. It was a very challenging project with over 1000 changes issued due to constant tenant and leasing changes during construction.