The Skills Trades and Technology Centre is a milestone achievement in the history of Red River College. Totaling approximately 100,000 square feet, the STTC has new laboratory and shop space, as well as classrooms for up to 1000 students per year in high demand trades and technologies. This includes carpentry, electrical and heating, sheet metal, ventilation, and HVAC.
SCOPE OF WORK
New Carpentry Room with All Equipment
New HVAC Sheet Metal Shop and Equipment
New Refrigeration Lab with All Equipment to Facilitate Actual Field Issues and Repairs
New Robotic Labs and a state-of-the-art Smart Factory with Specialized Laser Lathes and a 3D Printer
Installed a system which shows the consumption of all the electrical distributions, water, and gas
Data Infrastructure for CAD Classrooms
Lighting with daylight sensors to moderate the light levels in room with natural lighting
Wescan was selected by PCL, Smith Carter Architects (SCA), UCN and MIT on this design assist project to construct both the mechanical and electrical for this new university in Thompson Manitoba.
The Journey to Churchill project is one of the largest Polar Bear Research Centre and Exhibits in the World. Wescan provided Mechanical services for the state of the art facility that houses polar bears, seals, muskox, arctic foxes, snowy owls and caribou.
Outlet Collection Winnipeg is a fully enclosed shopping center development with a total retail floor area of 570,000 square feet. It was a very challenging project with over 1000 changes issued due to constant tenant and leasing changes during construction.