Manitoba Hydro Downtown Office
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
Canada’s Diversity Gardens is the final major phase in their development of the Assiniboine Park and Zoo that was launched in 2009. The Leaf is the corner stone of the new 30-acre diversity garden that will become a magnificent indoor, multi-seasonal attraction; It will be one of the most visually stunning places of its kind in North America. The leaf combines educational rooms, an event space with a commercial kitchen and bar, and multiple biomes which are highlighted by North America’s largest indoor waterfall. Mechanical Highlights include: a geothermal system for environmental control, a filtration system for the biome’s water feature/fog system, and root heating systems.
Design Assist Build
Scott Stronciski
Mark Milne
Assiniboine Park Conservancy
Bird Construction Group
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
Scope of work included installation of the lighting system, energy efficient sport lighting system, building control systems, communication systems, energy efficient distribution system, state of the art entertainment system (including jumbo-tron), and life safety systems.
Wescan performed components of the demolishing of a 25,000 sq ft. facility while simultaneously maintaining functional hospital systems that included: Fire Protection, Ventilation, Medical Gas, Sanitary Sewer, Storm, Hot Water Heating, Chilled Water, Low Pressure Steam, Medium Pressure Steam and High Pressure Steam.
1049 Logan Avenue, Winnipeg, R3E 1P6 Canada
Copyright © 2023 Wescan Construction Services. All Rights Reserved.