Manitoba Hydro Downtown Office
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
True North Square was a unique project comprising of two towers. The first tower, 242 Hargrave, is 365,000 square feet of Class A Office Space spread out over 17 stories; The second tower, 225 Carlton, is comprised of 200,000 square feet of commercial and residential space spread out over 25 floors. These two towers also share a common public realm area that is built upon two levels of underground parkade.
For the first phase of this project, Wescan worked closely with AME Group and PCL to develop cost savings for the owner while still maintaining a high level of standards. In addition, our team focused on the mechanical operation systems that provide service to both towers in order to achieve LEED Gold certification. This was all achieved within a construction schedule of under 2 years, from the design to the substantial completion of 242 Hargrave.
Bid Spec
Jon Treloar
Logan Zimmerman
Perkins & Will
AME Group
PCL Constructors Canada
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
Scope of work included installation of the lighting system, energy efficient sport lighting system, building control systems, communication systems, energy efficient distribution system, state of the art entertainment system (including jumbo-tron), and life safety systems.
Wescan performed components of the demolishing of a 25,000 sq ft. facility while simultaneously maintaining functional hospital systems that included: Fire Protection, Ventilation, Medical Gas, Sanitary Sewer, Storm, Hot Water Heating, Chilled Water, Low Pressure Steam, Medium Pressure Steam and High Pressure Steam.