University College of the North
Wescan was selected by PCL, Smith Carter Architects (SCA), UCN and MIT on this design assist project to construct both the mechanical and electrical for this new university in Thompson Manitoba.
True North Square was a unique project comprising of two towers. The first tower, 242 Hargrave, is 365,000 square feet of Class A Office Space spread out over 17 stories; The second tower, 225 Carlton, is comprised of 200,000 square feet of commercial and residential space spread out over 25 floors. These two towers also share a common public realm area that is built upon two levels of underground parkade.
For the first phase of this project, Wescan worked closely with AME Group and PCL to develop cost savings for the owner while still maintaining a high level of standards. In addition, our team focused on the mechanical operation systems that provide service to both towers in order to achieve LEED Gold certification. This was all achieved within a construction schedule of under 2 years, from the design to the substantial completion of 242 Hargrave.
Bid Spec
Jon Treloar
Logan Zimmerman
Perkins & Will
AME Group
PCL Constructors Canada
Wescan was selected by PCL, Smith Carter Architects (SCA), UCN and MIT on this design assist project to construct both the mechanical and electrical for this new university in Thompson Manitoba.
The Journey to Churchill project is one of the largest Polar Bear Research Centre and Exhibits in the World. Wescan provided Mechanical services for the state of the art facility that houses polar bears, seals, muskox, arctic foxes, snowy owls and caribou.
Outlet Collection Winnipeg is a fully enclosed shopping center development with a total retail floor area of 570,000 square feet. It was a very challenging project with over 1000 changes issued due to constant tenant and leasing changes during construction.
1049 Logan Avenue, Winnipeg, R3E 1P6 Canada