Manitoba Hydro Downtown Office
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
Wescan was engaged by Bird to provide the base building mechanical services for a groundbreaking, plant-based food processing facility. This facility will be the first of its kind in the world to take canola & green peas and turn them into plant-based protein for human consumption.
Merit was a BIM project; Wescan took the engineers’ 100BIM level conceptual model to a 400BIM level model for full trade coordination. Wescan also used this model to facilitate a pre-fabrication level of 95% for all systems, which reduced the amount of material stored on-site.
Bid Spec
Jon Treloar
Patrick Tuominen
Epp Siepman
Brayden Jaspers
Bird Construction
Electrical installations consisted of state of the art lighting, building control systems, energy efficient distribution systems and life safety systems.
Scope of work included installation of the lighting system, energy efficient sport lighting system, building control systems, communication systems, energy efficient distribution system, state of the art entertainment system (including jumbo-tron), and life safety systems.
Wescan performed components of the demolishing of a 25,000 sq ft. facility while simultaneously maintaining functional hospital systems that included: Fire Protection, Ventilation, Medical Gas, Sanitary Sewer, Storm, Hot Water Heating, Chilled Water, Low Pressure Steam, Medium Pressure Steam and High Pressure Steam.
1049 Logan Avenue, Winnipeg, R3E 1P6 Canada
Copyright © 2023 Wescan Construction Services. All Rights Reserved.