Outlet Collection Winnipeg is a fully enclosed shopping centre development with a total retail floor area of 570,000 square feet.  It was a very challenging project, with over 1000 modifications due to constant tenant and leasing changes during construction. Wescan, PCL and the project team were able to work together to manage all of the revisions and complete construction on schedule.

SCOPE OF WORK
  • HVAC System which included 238 RTU’s, 10 MUA, Natural Gas Piping, Exhaust Fans, and Ductwork
  • Sanitary & Storm Sewer System
  • Domestic Water Systems
  • Building Automation System

download line card

Project Details

Owner: Ivanhoe Cambridge
Type of Service: Mechanical
Sector: Commercial
Completed: May 2017
Value: $8,770,000
Delivery Method

Bid Spec

Project Manager

Shawn Henry

Superintendent

Niels Kaczorowski

Engineer

Stantec Engineering

Contractor

PCL Constructors Canada

Project Gallery

Explore

Other Iconic Projects

True North Square

True North Square

True North Square was a unique project comprising of two towers. 242 Hargrave, which is 365,000 sq ft of Class A Office Space spread out over 17 stories, and 225 Carlton, which is comprised of 200,000 sq ft of commercial and residential space spread out over 25 floors.

View Project »

Canada Life

Canada Life TP-06 project was done as a design assist collaboration between NTAG, Bockstael, SMS, Nortec and Wescan to decommission an existing steam power plant and upgrade to a new natural gas hot water power plant, along with a replacement and centralization of the Chiller Plant at Canada Life campus.

View Project »
Merit

Merit Foods

Wescan was engaged by Bird to provide the base building mechanical services for a ground breaking, plant based food processing facility.